Heavy Civil

Anderson Road SW Widening Initiative

Ironclad partnered with Volker Stevin on a road widening project along Anderson Road SW from Elbow Drive to the transportation utility corridor increasing 4 lanes to 6 lanes. The work comprised significant asphalt roadway removal and detailed earthworks hauling program over the period of three seasons.

KEY DETAILS

Contract Value

$1,900,000

Project Owner

The City of Calgary

Completion Date

September 2019

Project Role

Subcontractor

Scope of Work

  • Asphalt removal and disposal (including milling).
  • Topsoil stripping with offsite removal.
  • Roadway common excavation.
  • Waste excavation and disposal.
  • Detailed earthworks and undercuts.

Resources & Challenges

  • Total Crew: 18 Persons
  • Equipment Used:
    3 Excavators, 3 Dozers, 3 Compactors, 3 Rock Trucks, 2 Scrapers, 
20  Highways Trucks.
  • Challenges:
    Significant roadway removals with off-site disposal and management 
of sophisticated dirt management program to keep site volumes balanced and paving work progressing.

Project Timeline

//   May 2023

Drilling & Pressure Grouting

//   May 2024

Sheet Pile Core Wall & Concrete Work

//   July 2024

Embankment Structure

//   September 2024

Spillway and Concrete Work

//   October 2024

Final Dam Commissioning

TESTIMONIAL