Environmental & Remediation

Brentwood Village Impacted Materials

Ironclad was subcontracted by CANA Construction for the Brentwood Village project, providing high-rise foundation excavation, commercial excavation, and environmental remediation of soils impacted with heavy metals.

KEY DETAILS

Contract Value

$1,132,142

Project Owner

BRIO Brentwood

Completion Date

December 2019

Project Role

Subcontractor

Scope of Work

  • Excavation and disposal of 5,000 tonnes of granular soils impact with heavy metals requiring disposal at Class II landfill.

No items found.

Resources & Challenges

  • Total Crew: 5 Persons
  • Equipment Used
    2 Excavators, 1 Loader, 1 Skidsteer, 9  Highway Trucks.
  • Challenges:
    The project faced challenges with contaminated material that was impacted with heavy metals that required onsite testing, segregation to containment cell and disposal at class II landfill.

Project Timeline

//   May 2023

Drilling & Pressure Grouting

//   May 2024

Sheet Pile Core Wall & Concrete Work

//   July 2024

Embankment Structure

//   September 2024

Spillway and Concrete Work

//   October 2024

Final Dam Commissioning

TESTIMONIAL