Commercial Buildings

BRIO Brentwood Village Excavation and Site Preparation

Ironclad was subcontracted by CANA Construction for the Brentwood Village project, providing high-rise foundation excavation, commercial excavation, and environmental remediation.

KEY DETAILS

Contract Value

$1,132,142

Project Owner

BRIO Brentwood

Completion Date

December 2019

Project Role

Subcontractor

Scope of Work

  • Bulk excavation for a high rise foundation.
  • Dewatering.
  • Backfill in winter conditions using 40mm drain rock.
  • Detailed excavation and backfill.
  • Final site grading.

Resources & Challenges

  • Total Crew: 10 Persons
  • Equipment Used:
    3 Excavators (1 Long Reach), 1 Loader, 1 Skidsteer, 1 Dozer, 16 Highway Trucks.
  • Challenges:
    The project faced challenges with potential contaminated material during excavation, requiring close coordination with soil testing consultants. Additionally, its location in a high-traffic area demanded strict accommodation measures.

Project Timeline

//   May 2023

Drilling & Pressure Grouting

//   May 2024

Sheet Pile Core Wall & Concrete Work

//   July 2024

Embankment Structure

//   September 2024

Spillway and Concrete Work

//   October 2024

Final Dam Commissioning

TESTIMONIAL

Right from project pre-planning to project execution 
and delivery Ironclad always delivers safely and on time!

Brodie Aiken, Cana Group of Companies | Brentwood Village Project